Location: Volusia, Florida
Client: Florida Department of Transportation District 5
Project Description: HSQ Group, Inc. as a prime consultant was responsible for plans preparation for the milling and resurfacing of this project including roadway plans, signing and pavement marking plans, signalization plans, Community Awareness Plan, utility coordination, technical specifications and post design services.
Design Engineer for SR 430 RRR project from Mulberry Drive to Atlantic Ave. (SR AIA) in the City of Daytona Beach, FL. The total length of the project is approximately 1 mile of 4-lane divided and 2-lane of the westbound. Services included milling and resurfacing pavement design, typical section package, public involvement, and plans preparation for roadway which included cross slope correction, signal plans and TCP.
Transportation ProjectUniversity & Central Blvd. Intersection Improvements
Location: Palm Beach County, Florida
Client: Palm Beach County Roadway Production
Project Description: HSQ Group, Inc. is the design consultant for the Annual Intersections Improvement Design County wide. The scope of services varies from simple intersections with minor widening to major complex intersection with addition of turn lanes, upgrading to signals, drainage design, permitting etc.
Location: Monroe County, Florida
Client: Florida Department of Transportation District 6
Project Description: HSQ Group, Inc. as a sub consultant is responsible for the drainage design of this 1.2 miles of 2 lane roadway that will be milled and resurfaced with segments of widening.
Location: Miami-Dade County, Florida
Client: Florida Department of Transportation District 6
Project Description: HSQ Group, Inc. as a prime consultant was responsible for plans preparation for the milling and resurfacing of this project including roadway plans, signing and pavement marking plans, signalization plans, Community Awareness Plan, utility coordination, technical and technical specifications.
Major arterial intersections improvement project. Scope of this project included implementing safety recommendations for an existing two-way four-lane undivided urban highway, milling and resurfacing, construction of bulb outs at intersections, drainage modifications which included installing new inlets, drainage conflict resolutions, etc. Also, restriping pavement marking to accommodate bike lanes.