HELPING OUR CLIENTS ON THE ROAD TO SUCCESS

OFFICES IN MIAMI, BOCA RATON AND ORLANDO

Call Us: 888-HSQ-4ENG888-477-4364

Commercial Projects

Commercial ProjectHampton Inns & Suites

071134-Hampton InnsLocation:   City of Homestead,  Miami-Dade County,  Florida

Client:   Prime Homebuilders

Project Description:   Hotel Facility

HSQ Group, Inc was responsible for modifying the overall PUD for Villa Portofino East to accommodate for the Hampton Inns & Suites. The scope of work also included the site plan preparation and processing.  Construction plans preparation for water, sewer, paving and grading, signing and pavement marking, cost estimation, permitting from Miami-Dade County DERM and construction inspection were also part of the scope of services for this Commercial Center.

HSQ-2009 Logo (Thumbnail) HSQ-2009 Logo (Thumbnail) HSQ-2009 Logo (Thumbnail) Additional Images

Commercial ProjectWestpoint Plaza

061155-West Point Plaza

Location:   City of Tamarac,  Florida

Client:   Butters Construction & Development

Project Description:   3 Acre Commercial Retail Development

The project included the design of a water distribution, sewage collection and drainage system.  The drainage system design included the modification of the master overall surface water management permit for the entire industrial park.  There was a right turn lane, sidewalk and drainage improvements constructed within Commercial Boulevard.

Commercial ProjectCommunity Christian Church

060425-Community Christian Church

Location:   City of Tamarac,  Florida

Client:   Community Christian Church

Project Description:   40,000 S.F. – 15 Acre Church Facility

The project included both construction management and inspection services.  The design and permitting of a right turn lane, sidewalk and drainage improvements along Commercial Boulevard were also part of the scope of services.

Commercial ProjectBankers Mortgage Trust

050859-Bankers Mortgage TrustLocation:   Town of Davie,  Florida

Client:   Hernandez Construction

Project Description:   18,000 S.F. Office Building

Water, sewer and drainage system designs were required on the project.  The development also included a modification to the overall master drainage permit through both the Central Broward Water Control District and the South Florida Water Management District.